
Extruding Process relocation from existing facility in Rochester NY. Program included 22,000 square feet of aggregate space throughout the ATC, DEX and Cobra Buildings at Dow Advanced Materials - Marlborough Facility.
Process piping design included provisions for:
Use of elevated natural gas pressures required application for special permission from the Massachusetts Board of Plumbers and Gas Fitters
Pipe materials and joining methods included: